Development Projects for FY 2025/2026

S/No.DESCRIPTIONAMOUNT
1.Cabro works along mwingi kyuso junction road next to kanu hall4,985,000.00
2.Repair and maintenance of 6no high masts in1,988,017.30
3.Construction of perimeter wall at slaughter house-phase 11,999,300.00
4.Construction Of 4door Pit Latrine With Urinal At Thokoa Market899,696.00
5.Installation Of 2no. 2-Arms Integrated Solar Lights At Musola And Nguluma Markets In Migwani Ward943,961.60
6.Construction Of 4door Pit Latrine With Urinal At Musuani Market899,696.00
7.Installation Of 2no. 2-Arms Integrated Solar Lights At Muyange And Ivuoni Markets In Migwani Ward943,000.00
8.Installation Of 2no. 2-Arms Integrated Solar Lights At Ndiani And Muruana Markets In Waita Ward942,048.00
9.Installation Of 2no. 2-Arms Integrated Solar Lights At Masokani And Matuva Markets In Waita Ward943,998.72
10.Construction Of Open Drainage Repair Between Kitui Teaches Sacco To Kasina Primary Road2,003,373.31
11.Construction Of Emergency Works For Pothole Patching From Hospital Junction To Kanini Kaseo Road2,991,448.33
12.Construction Of Culverts And Approaches Between Kathonzweni Secondary And AIC Church Road2,175,396.64
13.Construction Of Culverts And Open Drainage Installation At Kwa Mukeni Road1,812,526.49
14.Installation of 2no. 2-arms integrated solar lights at Itongolani Market in Kiomo/Kyethani Ward943,000.00
15.Installation of 2no. 2-arms integrated solar lights at Kairungu Market in Kiomo/Kyethani Ward944,000.00
16.Cabro Works Opposite Co-Op Bank(Bwtn Highway And Satson)1,196,405.80

Development Projects for FY 2024/2025

S/nProjectAmount
1.2no. 2 Arms Integrated Solar Lights At Maongoa Shopping Centers In Waita Ward993,711.83
2.2No. 2 Arms Integrated Solar Lights At Kisovo Market, Migwani Ward994,070.13
3.2no. 2 Arms Integrated Solar Lights At Kavingoni Shopping Centers In Kiomo/Kyethani Ward993,028.80
4.Repair Of 30M Electric Powered High Mast At Mavoko1,986,854.50
5.Repair Of Streetlights And Installation Of Solar Floodlights At Kathonzweni And Kyulungwa Shopping Centers1,489,147.11
6.For Proposed Repair Of Municipality Office Space – Mwingi Municipality798,947.77
7.Repair Of Assorted Electric Powered High Masts1,991,074.80
8.Construction of Paved Walkway Along Nzeluni Road (Musila Garden)2,636,310.66
9.Open Storm Water Drainage Along Postbank To Kazuri Building2,394,460.00
10.Open Storm Water Drainage Along Huruma – Chomazone1,989,558.00
11.Grading And Gravelling Of Assorted Backstreet Roads1,494,110.50
12.Construction of Open Storm Drainage Along Ideal Hotel1,980,259.27